Sometimes you may want to provide multiple options for your client, but you don't want them all to tally in the project total.
You can easily do this from the "Pricing" tab within an item. At the bottom of the page, you'll see a check box that says "Include in Project Total" as shown below.
If you do not want the price of an item tallied in the project total, just simply uncheck the box.
If you want to see which items you have not included in the budget, use the Display Options in the action bar and check "Hide Items Not Included in Total" like thisđ
Note: Some statuses are automatically excluded from the total. On Core and Core Plus, that's Unspecified and Rejected. On legacy plans (Solo, Studio, Firm, Enterprise, Spec Lite, Spec Pro), it's Unspecified and Disliked. To count a selection you saved with the Clipper, change its status, for example, to Proposed or Budgeted, instead of using the checkbox. See Include or Exclude Selections from Project Totals.